Artemis II Engine Section Moves to Final Assembly
Video source record: https://images.nasa.gov/details/MAF_20220524_CS2_ES_Move to Final
Player mode uses your custom Wikivideos controls.
Summary
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans. While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydro
This page is styled with a Wikimedia-like layout while preserving the Wikivideos player and chapter workflow.
Details
- Source collection: NASA
- License: Public Domain (US Government)
- Category: Mathematics
Wikipedia cross-links
Academic references
- Primary source record: https://images.nasa.gov/details/MAF_20220524_CS2_ES_Move to Final
- Topic lookup: Google Scholar search for “Artemis II Engine Section Moves to Final Assembly”